McQuay IM 937 51
Check, Test, and Start Procedure Form
Check, Test, and Start Procedure Form
Compressorized Equipment Warranty Registration Form: Complete this form and
return to McQuay, Warranty Department, within 10 days to comply with the terms of McQuay
Warranty.
Check, Test, and Start Procedure for SWP/SWT (Self-Contained Air Conditioning Systems)
Job name: ________________________________________________ McQuay G.O. #: _______________________
Installation address: ______________________________________________________________________________
City: _____________________________________________________ State: _______________________________
Purchasing contractor: ___________________________________________________________________________
City: _____________________________________________________ State: _______________________________
Unit model number: ________________________________________ Serial number: ________________________
Compressor #1 serial number: _____________________ Compressor #2 serial number:________________________
Compressor #3 serial number: _____________________ Compressor #4 serial number:________________________
Compressor #5 serial number: _____________________ Compressor #6 serial number:________________________
Mark NA on all items that do not apply to the type of the unit. See the IM bulletin for more information. Make any additional
comments on a separate sheet of paper and attach to this form.
Initial check
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Is any shipping damage visible? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes No
Is the unit installed level? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes.No
Is the unit positioned to provide adequate free area for service and operation?. . . . . . . . . . . . . . . . . . . . . . Yes No
Are the fan drives properly aligned and belts adjusted? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes No
Does the fan turn freely? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes No
Are all setscrews on pulleys, bearings, and fans tightened?. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Yes No
Are the condenser water temperature sensors located correctly? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes No
Has the installing contractor installed the return air temperature sensor in the return air stream? . . . . . . . . Yes No
Has the installing contractor installed the high and low static pressure sensor tubing in the ductwork?. . . . Yes No
Does electrical service correspond to the unit nameplate? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes No
Are adequate disconnect and circuit protectors installed? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Yes No
Is the unit adequately grounded? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Yes No
Are all electrical power connections tight? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Yes No
Have the compressor heaters operated continuously for 24 hours prior to startup?. . . . . . . . . . . . . . . . . . . Yes No
Does all electrical wiring conform to unit electrical diagram? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Yes No
Does all field wiring conform to electrical diagrams?. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes No
Are all service valves open? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes No
Have all shipping hold-down plates securing the fan frame been removed? . . . . . . . . . . . . . . . . . . . . . . . . Yes No
On unit with ducted return, has the low side tubing for PC5 (dirty filter switch) been installed? . . . . . . . . . . Yes No
Are all the cleanout plugs installed (condenser, condensate trap, and optional waterside economizer)?. . . Yes No