88 Product Manual WHR-2
PART 3 - EXECUTION
3.01 INSTALLATION
A. Install chiller and remote condenser with interconnecting piping in strict
accordance with manufacturer’s requirements, shop drawings, and Contract
Documents. Chiller manufacturer must approve the refrigerant piping design.
B. Adjust and level chiller in alignment on supports.
C. Coordinate electrical installation with electrical contractor.
D. Coordinate controls with control contractor.
E. Install, pressure test, and evacuate field refrigerant piping.
F. Provide all appurtenances required to insure a fully operational and functional
chiller.
3.02 START-UP
A. Ensure proper charge of refrigerant and oil.
B. Provide testing, and starting of machine, and instruct the Owner in its proper
operation and maintenance.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the McQuay WHR 017EW and is the answer not in the manual?

McQuay WHR 017EW Specifications

General IconGeneral
BrandMcQuay
ModelWHR 017EW
CategoryChiller
LanguageEnglish

Related product manuals