EasyManua.ls Logo

Mec MME25 - Pre-start Inspection Report

Default Icon
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 17 Mast Series - Operator’s Manual
April 2021Section 6 - Pre-Operation & Workplace Inspection
Pre-start Inspection Report
Be sure that the operator’s manual are complete, legible and in the storage container located in the
platform.
Be sure that all decals are legible and in place. See Decals section.
Check for hydraulic oil leaks and proper oil level. Add oil if needed.
For flooded type batteries check for battery fluid leaks and proper fluid level. Add distilled water if needed.
Note:
Sealed AGM type batteries don’t require maintenance.
Check the following components or areas for damage, improperly installed or missing parts and
unauthorized modifications:
Electrical components, wiring and electrical cables
Hydraulic hoses, fittings, cylinders and manifolds
Battery pack and connections
Drive motors
Rollers and slide blocks on masts
Tires and wheels
Lifting chains and idler wheels
Mast and mast braces
Limit switches, alarms and horn
Nuts, bolts and other fasteners
Platform entry gate and guard rail
Alarms and beacons
Platform extension
Platform Control Panel
Pothole guard
Wire
Check entire machine for:
Cracks in welds or structural components
Dents or damage to machine
Be sure that all structural and other critical components are present and all associated fasteners and pins
are in right place and properly tightened.
NEVER perform work or inspection on the machine with the platform
elevated without first supporting the platform with either a forklift or
a crane. Alternatively, use a 2”×4” or recommended a 4”×4” a piece of
wood to support the mast section that is attached to the platform.
See page 31 for instructions.

Other manuals for Mec MME25

Related product manuals