EasyManua.ls Logo

Medite TES Valida - 4 Transport and Installation; Transport and Unpacking; Installation

Medite TES Valida
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
User Manual Thermal Unit TES Valida
Page 11 Rev. 04(12/2013)
Medite GmbH
.
Wollenweberstr. 12
.
31303 Burgdorf
.
Germany
Phone +49 5136 88 84 0
.
Fax +49 5136 88 84 55
.
info@medite.de
.
www.medite.de
4 Transport and Installation
4.1 Transport and Unpacking
The TES Valida™ Thermal Unit is delivered in a safety board. Move it only vertical and avoid galvanic
movements.
Place the device on a stable, smooth surface and remove safety board and protection film. Keep the
packing materials stored in case of a later transport.
Check the delivery for correctness and completeness. In case of missing or wrong equipment, please
contact your Medite® Sales Person.
4.2 Installation
Before starting the instrument, please make sure that your mains voltage corresponds to the value
indicated on the instrument.
The instrument is supplied ready to use. For connection to mains the included power cord for heating
instruments must be used. It must be connected to a socket with intact ground wire.