EasyManua.ls Logo

Mega MAC - Page 71

Default Icon
91 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MAC/MTT-OPS-1
26 FEB 2019
Appendix
MAC/MTT Operators Checklist
A-4
MAC/MTT-OPS(CL)-1
26 FEB 2019
6. (Front Bulkhead Location Only) Solenoid
Control Box – CHECK AND SECURED
7. MTT Front Mounts – CHECKED AND SECURED
8. Vehicle Hydraulic Tank – SERVICED
9. MTT Hydraulic Hoses & Cabling CHECKED FOR
SECURITY AND LEAKS
10. Chassis Pivot Bore Pins INSTALLED AND
SECURED
11. Tank Drain Petcocks – CLOSED
12. Spray Heads – SECURED AND SET
13. Water Pump – CHECKED
a. Water Pump Check to ensure volute case
drain valve is closed. Pump bracket for
evidence of overheating.
b. Drive Motor – Evidence of overheating.
14. Hose Reel – CHECKED
15. (Rear Bulkhead Location Only) Solenoid
Control Box – CHECKED
N-3