EasyManua.ls Logo

Mega MAC - After Operations

Default Icon
91 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MAC/MTT-OPS-1
26 FEB 2019
Appendix
MAC/MTT Operators Checklist
A-21
MAC/MTT-OPS(CL)-1
26 FEB 2019
AFTER OPERATIONS
These procedures are used to perform a walk-around
inspection after using the MEGA water tanker
systems. This inspection is in addition to and does
not replace the vehicle manufacturer’s inspection
requirements.
1. Vehicle parking brake – ON
2. Cab Control Switches – SET OFF
3. Chocks – As Required.
4. Water Cannon – CHECKED AND SECURED
5. Vehicle Hydraulic Tank – CHECKED
6. Tank Lines and Hoses – SECURED
7. Tank Drain Petcocks – As Required.
8. Spray Heads – SECURED AND SET
9. Water Pump Assembly – CHECKED
a. Water Pump Check for damage and volute
case drain valve set as required.
10. Hose Reel – CHECKED
N-20