Page 8 of 24
Optional: to arrange the tubing and
electrical cable in your working area, use
the Milliflex Oasis
®
guides for electrical
cable and tubing (item MMTUGUIDE).
Figure 10: Use of Milliflex Oasis
®
guides for
electrical cable and tubing (item MMTUGUIDE)
• Sanitize the internal flow of the pump
referring to the cleaning & maintenance
section
• Once the internal flow path sanitization
has been performed, take the two pump
heads out of their package and remove
the yellow covers
• Clean the pump heads using a wipe
moistened with a surface sanitizer listed
in the cleaning & maintenance section
• Install the pump heads on the pump body
• Lock the pump heads by turning
clockwise until the sign on the head is
aligned with the one on the pump body
Figure 11: The sign on a locked head is aligned
with the one on the pump body
The pump is ready for testing.