EasyManua.ls Logo

Mercury 225 HP - Shift Cable Installation

Mercury 225 HP
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
225 (4-STROKE) INSTALLATION MANUAL
Page 12 of 16
Shift Cable Installation
Install cables into the remote control following the instructions provided with the remote con-
trol.
NOTE: Install the shift cable to the engine first. The shift cable is the first cable to move when
the remote control handle is moved out of neutral.
1. Position remote control into neutral.
N
2. Shift outboard into neutral.
3. Align the shift pin (a) with the center mark (b).
NR
F
a
b
a-Shift Pin
b-Center Mark

Related product manuals