EasyManua.ls Logo

Mercury 25 Jet FourStroke - Water Testing

Mercury 25 Jet FourStroke
110 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Insert the steering cable into the tilt tube and secure with the steering
cable nut. Tighten the steering cable nut to the specified torque.
a - Steering cable nut
b - Steering bracket bolt and washer (2)
c - Steering cable seal
Description Nm lb‑in. lb‑ft
Steering cable nut 47.5 35
Steering Link Rod Fasteners
IMPORTANT: The steering link rod that connects the steering cable to the
engine must be fastened using the steering link rod fastening hardware
supplied with the engine. Never replace the locknuts with nonlocking nuts.
Nonlocking nuts may loosen and vibrate off, allowing the link rod to disengage.
!
WARNING
Improper fasteners or improper installation procedures can result in
loosening or disengagement of the steering link rod. This can cause a
sudden, unexpected loss of boat control, resulting in serious injury or death
due to occupants being thrown within or out of the boat. Always use required
components and follow instructions and torque procedures.
a
c
b
59494
INSTALLATION
88 eng

Table of Contents

Related product manuals