EasyManua.ls Logo

Mercury Freshwater - Bow Mount Installation

Mercury Freshwater
41 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MOUNT INSTALLATION
eng 19
1. Select an appropriate area on the deck of the boat to install the
mount. Ensure the forward mounting screws will not penetrate
the hull.
41280
Mount on deck with a 7.6 cm (3 in.) clearance
2. Using a Phillips head screwdriver and the decket screws
provided in the hardware bag, secure the decket to the mount
base. (The decket for heavy duty spring mounts can be installed
last.)
3. Use the bow mount base as a template to mark the location of
the front mounting holes in the plastic decket and the rear
mounting holes on the mount base.
38097
4. Drill the mounting holes with a 6.5 mm (0.25 in.) diameter drill bit.
Remove any debris.

Related product manuals