EasyManua.ls Logo

Merrylock MK 4055 - 6 Telescopic Thread Stand; 7 Preparation for Threading; Setting up the Thread Guide Holder; Anti-Spill Net

Merrylock MK 4055
33 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
7. PREPARATION FOR THREADING
(1) SETTING UP THE THREAD GUIDE
HOLDER
* This machine is shipped with the thread guide
holder on the top of Styrofoam.
* Fully extend the thread guide holder.
* The two joints on the telescope will click into place
when they are correctly positioned.
* Center the thread guides above the spool pins.
* Place thread over the cone adapters on the spool
pins.
Note : Your new machine is threaded to sew Triple
Cover Stitch. Refer to Page 15 for
instructions on tying on to the threads.
Anti-spill net
(2) ANTI-SPILL NET
* When using synthetic threads that easily spill off
the cone, slip the anti-spill net furnished with the
machine over the thread from the bottom of the
cone leaving the thread end hanging free at the
top the anti-spill net as shown at right.
6. TELESCOPIC THREAD STAND
* Place the thread spools over the cone holders on
the spool pin.
* If the machine is already threaded, straighten the
threads to prevent tangling.
1
2

Related product manuals