EasyManuals Logo

Miele TKR 650 WP User Manual

Miele TKR 650 WP
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #70 background imageLoading...
Page #70 background image
Installation and connection
70
Installation
Levelling the dryer
Mak
e sure the dryer door can be
opened without hindrance after
installation.
The appliance must stand perfectly
level
to ensure safe and proper
operation.
The screw feet can be adjusted to
compensa
te for any unevenness in the
floor.
Ventilation
The cool
air intake at the front of
the dryer must not be blocked or
covered. This would hinder a
sufficient intake of cool air for the
heat exchanger.
Do not block the gap between
the
bottom of the tumble dryer and
the floor with plinth facings, deep
pile carpet etc. This would hinder a
sufficient flow of air to the dryer.
Air which is taken in to cool the heat
e
xchanger is then blown back out of
the dryer and warms up the air in the
room. It is therefore very important to
ensure adequate ventilation, e.g. by
opening a window. Otherwise drying
durations may be longer (increased
energy requirement).
Before moving the tumble dryer
again (e.g. when moving house)
After each use a small quantity of
condensed water will collect in the area
of the pump. This water can run out if
the tumble dryer is tipped up when it is
being moved. Recommendation: run
the
Warm air pr
ogramme for
approximately 1 minute before moving
the tumble dryer. Any remaining
condensed water will then be fed into
the condensed water container or out
through the drain hose.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Miele TKR 650 WP and is the answer not in the manual?

Miele TKR 650 WP Specifications

General IconGeneral
BrandMiele
ModelTKR 650 WP
CategoryDryer
LanguageEnglish

Related product manuals