Primeroyal / Milroyal
®
Critical
Service HPD Liquid End
Instruction Manual
Manual No : 54261
Rev. : 0
1
Rev. Date : 05/2019
Question and Answer IconNeed help?

Do you have a question about the Milton Roy PRIMEROYAL and is the answer not in the manual?

Milton Roy PRIMEROYAL Specifications

General IconGeneral
BrandMilton Roy
ModelPRIMEROYAL
CategoryWater Pump
LanguageEnglish

Summary

PRECAUTIONS

Electrical Safety

Ensure power is off and properly grounded; check motor protection against rated current.

Over Pressure Protection

Install a safety/pressure-relief valve to protect system components.

SECTION 1 - DESCRIPTION

1.1 SPECIFICATIONS

Technical specifications for the HPD liquid end, including accuracy, temperature, and pressure.

SECTION 2 - INSTALLATION

2.2 SAFETY PRECAUTIONS

General safety guidelines for installation, operation, and maintenance of HPD pumps.

2.4 PIPING CONNECTIONS

General instructions for connecting suction and discharge lines.

SECTION 3 - OPERATION

3.1 PUMP START-UP PROCEDURE (VARIABLE STROKE PUMPS)

Detailed steps for starting the pump, including oil filling and motor rotation.

3.2 RELIEF VALVE ADJUSTMENT

Procedure for setting the pressure relief valve for safe operation.

SECTION 4 - MAINTENANCE

4.1 DIAPHRAGM REPLACEMENT (FIGURE 2, SHEET 1 & 2)

Step-by-step guide for replacing the pump diaphragm.

4.9 CORRECTIVE MAINTENANCE

Troubleshooting and repair procedures for specific components.

SECTION 5 - LEAK DETECTION (PRESSURE SENSING SYSTEM)

5.2 PRINCIPLE OF OPERATION

How the leak detection system senses diaphragm ruptures.

SECTION 6 - INSTALLATION & OPERATION (PRESSURE SENSING SYSTEM)

6.3 DISASSEMBLY / ASSEMBLY

Steps for disassembling and assembling the leak detection system.