EasyManua.ls Logo

MIMAKI SWJ-320 S2 - Page 166

MIMAKI SWJ-320 S2
210 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© 2013 MIMAKI ENGINEERING CO.,LTD. 6.6.4 P.1
R.1.0
1
2
3
4
5
6
7
8
MAINTENANCE MANUAL > Disassembly and Reassembly > Pressurizing relations > Pressure switch assy.
Model
SWJ-320S
Issued
2012.07.19
Revised F/W ver
Remark
1.0
Rev.
6.6.4 Pressure switch assy.
Work procedures
1. Turn off the main power supply and remove the power plug
from the main body.
2. Open the cover LR.
3. Remove the screw, and remove the BKT.
4. Disconnect the relay connectors of pressure switch assy. on the
bracket back.
5. Remove the following covers.
CoverST-L
6. Remove the screw, and remove the pressure switch assy..
7. Reverse the disassembly procedure for reassembly.
After turning off the sub and main power switches, unplug the power cord. Make sure to take 15
minutes before restarting the operation. It is very dangerous if sleep mode functions mistakenly
during the operation.
Additionally, if electric charges are still remaining, it may cause damage to electronic parts or the like.
Pressure switch assy.
4 3 2 1
Air tank sensor assy.
Bracket
screw(x2)
The bracket back
Relay connectors (6 positions)
screw(x4)

Table of Contents

Other manuals for MIMAKI SWJ-320 S2

Related product manuals