EasyManua.ls Logo

Mitsubishi Electric Q13UDVCPU - Page 337

Mitsubishi Electric Q13UDVCPU
720 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
335
APPENDICES
A
Appendix 1 Error Codes
Appendix 1.4 List of error codes (2000 to 2999)
2106
[SP.UNIT LAY ERR.]
Five or more MELSECNET/H modules have
been installed.
Five or more Ethernet interface modules have
been installed.
Collateral information
Common information: Module No. (Slot No.)
Individual information: -
Diagnostic timing
At power-on/At reset
Reduce the number of MELSECNET/H
modules to four or less.
Reduce the number of Ethernet modules to
four or less.
RUN: Off
ERR.:Flashing
CPU Status:Stop
Qn(H)
QnPH
QnPRH
[SP.UNIT LAY ERR.]
Two or more MELSECNET/H modules were
installed.
Two or more Ethernet modules were installed.
Three or more CC-Link modules were installed.
Collateral information
Common information: Module No. (Slot No.)
Individual information: -
Diagnostic timing
At power-on/At reset
Mount only one MELSECNET/H module.
Mount only one Ethernet module.
Reduce the number of CC-Link modules to
two or less.
Q00J/Q00/Q01
[SP.UNIT LAY ERR.]
The same network number or same station
number is duplicated in the MELSECNET/H
network system.
Collateral information
Common information: Module No. (Slot No.)
Individual information: -
Diagnostic timing
At power-on/At reset
Check the network number and station
number.
Q00J/Q00/Q01
Qn(H)
QnPH
QnPRH
[SP.UNIT LAY ERR.]
Two or more Ethernet modules were installed.
Collateral information
Common information: Module No. (Slot No.)
Individual information: -
Diagnostic timing
At power-on/At reset
Mount only one Ethernet module.
L02SCPU
L02SCPU-P
L02CPU
L02CPU-P
[SP.UNIT LAY ERR.]
Three or more Ethernet modules were installed.
Collateral information
Common information: Module No. (Slot No.)
Individual information: -
Diagnostic timing
At power-on/At reset
Reduce the number of Ethernet modules to
two or less.
L06CPU
L06CPU-P
L26CPU
L26CPU-P
L26CPU-BT
L26CPU-PBT
2107
[SP.UNIT LAY ERR.]
The start X/Y configured in the I/O Assignment tab
of "PLC Parameter" is overlapped with that for
another module.
Collateral information
Common information: Module No. (Slot No.)
Individual information: -
Diagnostic timing
At power-on/At reset
Configure the I/O assignment setting of the
PLC parameter again so that it is consistent
with the actual status of the intelligent
function modules, special function modules,
and I/O modules.
RUN
: Off
ERR.:Flashing
CPU Status:Stop
QCPU
[SP.UNIT LAY ERR.]
The start X/Y configured in the I/O Assignment tab
of "PLC Parameter" is overlapped with that for
another module.
Collateral information
Common information: Module No. (Slot No.)
Individual information: -
Diagnostic timing
At power-on/At reset
Configure the start X/Y again in the I/O
Assignment tab of "PLC Parameter"
according to the intelligent function module
and I/O modules connected.
Reset the CPU module and run it again. If
the same error code is displayed again, the
cause is a hardware failure of the CPU
module, I/O module, intelligent function
module, END cover, branch module, or
extension module. Please consult your
local Mitsubishi representative.
LCPU
Error
code
Error and cause Corrective action
LED status,
CPU status
Corresponding
CPU

Table of Contents

Related product manuals