4 - 11
MELSEC-Q
4 INSTALLATION, WIRING AND MAINTENANCE OF THE PRODUCT
[Processing example of shielded cables]
Connections of FG wire and each shielded cable
Coat the wire with
insulaing tape.
Remove the covering from all shielded cables and bind
the appeared shield with a conductive tape.
Solder the shield of any one of the
shielded cables to the FG wire.
Assembling of connector (A6CON1/A6CON2)
Wrap the coated part
with a heat contractile
tube.