EasyManua.ls Logo

modec MC89 - Fixing the BR001 Torque Management Arm and Anchoring Strap

modec MC89
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18
both operators and equipment, modec can develop and/or adapt special torque management
systems.
Never use a portable actuator with a torque management system that is under-sized, unstable
or badly positioned.
c. Fixing the BR001 torque management arm and anchoring strap
Pull each fixation spring with the ring and rotate for a quarter turn so that they stay in the pulled
position. Place the black ring of the torque management bar on the flange so that the 6 pins
enter the corresponding holes. Make a quarter turn with the fixation springs rings and release
the springs making sure they come back. Check that the torque management bar is properly
secured to the flange.
Setting the system for rotation “D1”
Setting the system for rotation “D2”
90°
Handwheel rotation
direction : « D1 »
Position
of the strap / chain
90°
Handwheel rotation
direction : « D2 »
The chain must remain
in the plane of the reaction
bar and must not work at an
angle greater than ± 30 ° to
the perpendicular of the bar.
Except if otherwise engraved on the
torque reaction system, the maximum torque
is 1000 Nm (740 lb.ft)