3.1 Unpacking
Go to hps://bit.ly/3pzWeAW and watch a video on how to unpack the machine.
Each Universal Calibrang Machine is assembled and tested at the factory prior to shipment. The calibrang
machine is packed completely and assembled as a unit in a single crate. The lower yoke platen is bolted to the
lower machine platen to form a rigid assembly for shipment, and the hand pump assembly is disconnected
from the jack and aached separately to the shipping crate.
The uncrang procedure is straighorward. With the crate in a horizontal posion, remove the packing materi-
al from the crate, being careful to check for small parts and accessories that may be packed with the calibrang
machine, including the hydraulic hose.
Cauon: Before liing, ensure the unit does not exceed the capacity of the liing equipment.
3.2 Machine Installaon
Select a locaon for the machine where the variaon in ambient temperature is minimized to facilitate proper
calibraon. Set the machine in place on a at surface, and level the machine by adjusng the feet using the
circular level supplied with the machine.
The 10,000 lbf (50 kN) capacity machine is normally placed on a bench or sturdy table. Larger machines are
usually installed adjacent to a bench or other suitable work surface to which the hand pump can be fastened.
Aer the machine has been installed, remove the bolt that holds the lower yoke to the lower machine platen.
3. Preparaon for Use