AC Line / Load Reactors
User Manual
Data subject to change without notice 20 of 32 INSTR-011 REL. 150109 REV.006
See www.mtecorp.com for current data and CAD drawings
Recommended conduit entry for Floor Mounted
NEMA 1 enclosed reactors
Note: The entry locations shown above are for reference only. The electrician installing the reactor
guided by the local codes determines the final entry wiring. MTE does not pre- punch entry holes or
provide wiring hardware with the standard product.