EasyManuals Logo

MTS Systems 318 Series User Manual

MTS Systems 318 Series
120 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #52 background imageLoading...
Page #52 background image
318 Load Unit
52
Installation
2. Inspect the load unit for shipping damage.
Look for the following:
Scratches in the load unit or lift cylinder columns
Damaged electrical connections
Damaged hydraulic connections
Dents and other structural damage
Torn, kinked, or breaking hoses
Report any damage found to both the carrier and MTS. In the U.S. and
Canada, call the MTS HELPLine at 1-800-328-2255. Elsewhere, contact
your local MTS office.
3. Wrap slings around the columns at the load unit’s balance point.
A. With someone else steadying the load unit, slightly lift the load unit to
ensure that you have found its balance point. Keep adjusting the slings
and slightly lifting the load unit until you find its balance point.
B. Lift the load unit just enough to clear its pallet. Slide the pallet out of
the way. Then lower the load unit so that its feet rest on rubber mats
and its columns on the wooden blocks.
4. Lift the load unit upright.
A. Attach the chains to the lifting eyebolts. Move the crane/forklift to keep
the chains as straight as possible.
B. Slowly raise the load unit to its upright position. As the unit rises, keep
moving the crane to keep the chains as straight as possible. Do not
exceed a 30° chain angle.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the MTS Systems 318 Series and is the answer not in the manual?

MTS Systems 318 Series Specifications

General IconGeneral
BrandMTS Systems
Model318 Series
CategoryTest Equipment
LanguageEnglish

Related product manuals