318 Load Unit
76
Routine Maintenance Overview Checklist
Maintenance
Response to Full Stroke Waveform, Visual
and Audible
MTS MTS MTS MTS
Valve Balance check displacement control MTS MTS MTS MTS
Valve Dither Response MTS MTS MTS MTS
Grips
Cursory Check of Grips/Grip Control MTS MTS MTS MTS
Grip Supply Connections are Dry MTS MTS MTS MTS
Grip Seals are Dry MTS MTS MTS MTS
Grip Action is Acceptable MTS MTS MTS MTS
Lubricate Grip Inserts MTS MTS MTS MTS
*Symbol denotes services performed by equipment operators. Most of these procedures involve visual checks that
should not interfere with test system operation. These checks are also completed by trained field service
engineers on each Routine Maintenance visit.
†Symbol denotes service performed by trained field service engineers as part of an MTS Routine Maintenance
plan. Some of these procedures require special service tools and/or specific service training to complete.
Recommended service to be performed at each running time interval noted
C
ALENDAR TIME USING 8 HOUR RUNNING TIME RATE
PER DAY
DAILY WEEKLY BIWEEKLY ANNUALLY
RUNNING TIME-HOURS 8 40 80 500 1000 1,500 2,000