EasyManua.ls Logo

MX F300 Series - FAST-LOCK Hitching

MX F300 Series
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
25
Subject to modication
Ensure that the male and female couplings are clean before
connection. Clean them if necessary.
Connect the hoses for implements with hydraulic functions.
9.2 FAST-LOCK implement carrier
“Open” position, to allow space for the implement parts.
Align the loader with the implement,
Fit the implement carrier onto the implement,
Crowd slightly and raise the loader to lift the implement from the
ground.
Press the green and padlock buttons while moving the dumping
lever to the left (crowding).
The implement is now locked.
NOTE: If the implement has one or more hydraulic functions,
connect the hoses.
CAUTION: Checks to be carried out before moving:
Press the implement down on the ground (the tractor's front
wheels lift) to check correct locking.
Operate each moving part fully, in each direction, to check the
tightness of the hydraulic circuit and the correct routing of the
hoses.

Related product manuals