EasyManuals Logo

Napoleon 9600 Series User Manual

Napoleon 9600 Series
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #14 background imageLoading...
Page #14 background image
W415-0973 / B / 08.28.13
14
IOM
IOM
7.2 ACCEPTABLE MATERIALS IN UNITED STATES
7.0 VENTING AND COMBUSTION PIPING
7.1 ACCEPTABLE MATERIALS IN CANADA
H3.10
READ, UNDERSTAND AND FOLLOW ALL INSTRUCTIONS IN THIS SECTION. FAILURE TO
PROPERLY VENT OR SUPPLY COMBUSTION AIR TO THIS FURNACE CAN CAUSE CAR-
BON MONOXIDE POISONING, OR AN EXPLOSION OR FIRE, RESULTING IN PROPERTY
DAMAGE, PERSONAL INJURY OR LOSS OF LIFE.
WARNING
!
!
H11.1
Effective August 1, 2007, all vent piping materials and ttings for ue gas venting must be ULC S636 listed
and identi ed as such on the material. The rst 3ft. (900mm) of venting must be readily available for visual
inspection. Speci ed primers and glues of the certi ed vent system must be from a single system manufacture,
and not intermixed with other system manufacture’s vent system parts. The components of the certi ed vent
system must not be interchanged with other vent systems, or unlisted pipe, and or ttings. Follow the venting
manufacturers instructions on installation, cutting, de-burring, cementing, curing and supporting of the venting
system.
This furnace must be vented with ULC S636 certi ed:
PVC (Polyvinyl Chloride), OR
• PPE (Polypropolene) material
with a rating of 149°F (65ºC) or more.
The combustion air piping does not have ue gases travelling through it and may be installed with common
ABS, PVC or CPVC piping or ttings. This piping, ttings, primer and cement will need to be installed as per
the manufacturers instructions including cementing, cutting, curing and supporting the piping.
H11.2
For United States installations, the combustion air and vent piping and ttings may be comprised of:
Schedule 40 PVC, ASTM D1785 or CSA B137.3
PVC-DWV, ASTM D2665 or CSA B181.2
Schedule 40 CPVC, ASTM F441 or CSA B137.6
PVC PRIMER AND SOLVENT CEMENT: ASTM D2564
PPE ULC S636
Follow piping manufacturers instructions on proper installation of piping and ttings including cutting, deburring
,
priming, cementing, curing and supporting.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Napoleon 9600 Series and is the answer not in the manual?

Napoleon 9600 Series Specifications

General IconGeneral
AFUE Rating96%
Blower TypeVariable speed
Gas ValveModulating
Ignition SystemHot surface ignition
Fuel TypeNatural gas or propane
Heat ExchangerStainless steel
Blower MotorECM
Heat Exchanger WarrantyLifetime limited
Parts Warranty10 years
Vent Size2" or 3"
Stages2-stage
Heating Capacity40, 000 - 120, 000 BTU

Related product manuals