EasyManua.ls Logo

NCR 7870 - Chapter 3: Site Preparation

NCR 7870
228 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 3: Site Preparation
For the NCR 7870 to operate efficiently and safely, the selected
installation site must meet certain requirements. Ensuring that these
conditions are met and maintained will protect the 7870 from
unnecessary wear and potential damage as well as easing installation.
This chapter covers
•
Getting Started
•
About Site Preparation
•
Customer Responsibilities
•
Environmental Requirements
•
Checkstand Power and Wiring Considerations
•
Checkstand Considerations
•
Cable Lengths and Hole Sizes
•
7870 Dimensions

Table of Contents