EasyManua.ls Logo

NEC NEAX 7400 ICS - 003-9 Screwing the RACK PARTS to a Wall

NEC NEAX 7400 ICS
125 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AD-25182501 CHAPTER 3
Page 27
Revision 1.0.1
NAP- 200-003
Sheet 9/29
Installation of Main Equipment
Figure 003-9 Screwing the RACK PARTS to a Wall
350
350
250
ANCHOR (x4/PIM)
(SEE FIGURE 002-2)
(WALL)
382
M4 MACHINE SCREW-B (x4/PIM)
SECURED TO RACK PARTS
(PROVIDED WITH RACK PARTS)
SCREW-A (x4/PIM)
SECURING RACK PARTS TO WALL
(LOCALLY PROVIDED)
(SEE TABLE 003-1)
M5 MACHINE SCREW-C (x4/PIM)
(PROVIDED WITH RACK PARTS)
(SEE FIGURE 003-10)
RACK PARTS
250
Unit : mm

Table of Contents