You can also take the following steps to prevent damage from electrostatic discharge
(ESD):
•
When unpacking a static-sensitive component from its shipping carton, leave it in
the antistatic package until you are ready to install it. Just before unwrapping the
antistatic package, discharge static electricity from your body.
•
Before moving a sensitive component, place it in an antistatic container or package.
•
Handle all sensitive components in a static-safe area. If possible, use antistatic floor
pads, workbench pads, and an antistatic grounding strap.
Step 3: Unpack the switch
The following figure shows the package contents.
Figure 7. Switch package contents
DescriptionNumberDescriptionNumber
Category 5e (Cat 5e) flat Ethernet cable4Switch1
Mounting screws (2) and washers (2)5Power cord with adapter (varies by region)2
Footpads (4)6Installation guide3
Check the contents of the boxes to make sure that all items are present before installing
the switch.
Hardware Installation Guide25Installation
Insight Managed 8-Port Gigabit (Hi-Power) PoE+ Smart Cloud Switch with NETGEAR FlexPoE Power