EasyManuals Logo

NETGEAR GC728X Hardware Installation Guide

NETGEAR GC728X
30 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #23 background imageLoading...
Page #23 background image
When unpacking a static-sensitive component from its shipping carton, leave it in the antistatic package
until you are ready to install it. Just before unwrapping the antistatic package, discharge static electricity
from your body.
Before moving a sensitive component, place it in an antistatic container or package.
Handle all sensitive components in a static-safe area. If possible, use antistatic floor pads, workbench
pads, and an antistatic grounding strap.
Step 3: Unpack the Switch
The following figure shows the package contents.
Figure 6. Switch package contents
Check the contents of the boxes to make sure that all items are present before installing the switch.
To check the package contents:
1. Place the container on a clean flat surface, and cut all straps securing the container.
2. Unpack the hardware from the boxes by carefully removing the hardware and placing it on a secure
and clean surface.
3. Remove all packing material.
4. Verify that the package contains the following items:
a. Switch model GC728X or GC728XP
b. Power cord (localized to the country of sale)
c. Rack-mounting brackets
d. Rack-mounting screws
Installation
23
Insight Managed 28-Port Gigabit Ethernet (PoE+) Smart Cloud Switch

Other manuals for NETGEAR GC728X

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the NETGEAR GC728X and is the answer not in the manual?

NETGEAR GC728X Specifications

General IconGeneral
BrandNETGEAR
ModelGC728X
CategorySwitch
LanguageEnglish

Related product manuals