EasyManua.ls Logo

Nibe F1355 Series - Page 20

Nibe F1355 Series
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
The heat pump (EB100) prioritises charging of hot water with a cooling module (EP14) via a reversing valve (EB100-
QN10). When the water heater/accumulator tank (CP10) is fully charged, (EB100-QN10) switches to the heating
circuit.
Additional heat (EB1) is connected automatically, when the energy requirement exceeds the heat pump capacity.
TWO F1355 DOCKED WITH ELECTRIC ADDITIONAL HEAT AND WATER HEATER (FLOATING
CONDENSING)
-EB100-QN10
-FL3
-BT6
-G
P10
-EB100-BT25
-QM43
-EB100-BT71
-EB1
-EB1
-QM42
-FL10
-XL28
-XL27
P
-EB100-BT1
-CM3
-BP6
-QM21
-QM33
-QM34
-EP12
-BT7
-EB101
-CP10
-EB100
-EB100
-EP21
-AA5
-BT2
-QN25
-GP20
-BT3
-RN11
-FL2
-CM1
-GP11
-BT70
-QZ-AA5
-QZ1
-RM23
-RN20
-RM24
-RN21
-FQ1
-EB10
-EB100
-RM11
-RM10
-FL10
-FL11
-EP15
-EP14
-RM13
-FL13
-FL12
-QM57
-RM12 -QM55
-QM52
-QM50
-QZ3
-QZ2
-QZ5
-QZ4
-EB101
-RM11
-RM10
-FL10
-FL11
-EP15
-EP14
-RM13
-FL13
-FL12
-QM57
-RM12 -QM55
-QM52
-QM50
-QZ3
-QZ2
-QZ5
-QZ4
-RM21
The heat pump (EB100) prioritises charging of hot water with a cooling module (EP14) via a reversing valve (EB100-
QN10). When the water heater/accumulator tank (CP10) is fully charged, (EB100-QN10) switches to the heating
circuit. When there is a demand for heat, cooling module (EP15) starts in heat pump (EB101) first. On large demand,
cooling module (EP14) also starts in (EB101) for heating operation.
Additional heat (EB1) is connected automatically, when the energy requirement exceeds the heat pump capacity.
If the water heater/accumulator tank (CP10) is fitted with a peak heater (EB10) plus accessories board (AA5), the
"temporary lux" function can be used.
NIBE F1355Chapter 4 | Pipe connections20

Related product manuals