Transport
However. the VPB/VPBS may be carefully laid on its
back when being moved into a building. The centre of
gravity is in the upper part.
VPB/VPBS should be transported and stored vertically
in a dry place. However, the VPB/VPBS may be carefully
laid on its back when being moved into a building.
R
0
+2
0
-2
1
R
0
HM flow
49 (50) °C
Hot water
51 °C
+2
0
-2
1
R
0
HM flow
49 (50) °C
Hot water
51 °C
R
0
Assembly
■
The water heater is only designed for upright install-
ation.
■
Position VPB/VPBS on a firm base that can take the
weight, preferably on a concrete floor or foundation.
Use the water heater's adjustable feet to obtain a
horizontal and stable set-up.
30 - 50 mm
30 - 50 mm
15 - 40 mm
■
The area where VPB/VPBS is located must be
equipped with floor drainage.
■
The water heater's installation area should always
have a temperature of at least 10 °C and max 30 °C.
Supplied components
VPB/VPBS Enamel
Potentiostat
Location
The kit of supplied items is placed on top of the
product.
5Chapter 2 | Delivery and handlingVPB/VPBS
2 Delivery and handling