EasyManua.ls Logo

Nice ALTO100C

Nice ALTO100C
35 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11 – English
English
3.QDjSSGDRKNSSDC@QLNMSGDAQ@BJDSBKNRDSGDKD@E@MCDMRTQDSG@S
it is aligned in contact with the travel stop and aligned with the other
leaf (if present). Caution! - If necessary, repeat point 2 to obtain per-
fect closure.
09. 3HUPDQHQWO\Ƅ[LQJWKHEUDFNHWRQWKHOHDI
a) 1DLNUDSGDRKNSSDC@QLEQNLSGDjWHMFAQ@BJDSNMSGDKD@EHEMNS
already performed in phase 08).
b) - Drill a hole in the leaf at the same point as the hole at the centre of the
brackeS@MCHMRDQS@RBQDV/DQL@MDMSKXjWSGDAQ@BJDSAXSHFGSDMHMF
the three screws fully down.
c) %HWSGDRKNSSDC@QLSNSGDAQ@BJDSHMRDQSHMFSGDOHM@MCRSNOADMYHMF
10. Manually locking the gearmotor
a) - Manually move the leaf to approximately mid-travel and lock the
gearmotor by means of the special key (refer to chapter “Manually
locking and releasing the gearmotor” in the “Operation Manual”).
Then manually move the leaf by a few centimetres in the opening
direction.
11. On 2-leaf gates.
a) - If the gate has two leafs, install the other gearmotor repeating all
operations described in paragraph 3.4 and in this paragraph.
1
2 3
5
15
7

Related product manuals