Do you have a question about the Nice Titan 912L and is the answer not in the manual?
Brand | Nice |
---|---|
Model | Titan 912L |
Category | Gate Opener |
Language | English |
Crucial instructions for anyone involved in installation to read and understand the manual thoroughly.
Provides definitions for vehicular swing-gate operators and gate classifications as per UL325 standards.
Introduces the Titan 912L swing gate operator, highlighting its features and warranty.
Lists technical specifications for the Titan 912L gate operator, including dimensions and capabilities.
Refers to ASTM F2200 for gate construction standards and requirements for automated gates.
Prohibits manual gate latches or locks due to potential for system failure and injury.
States the actuator is for vehicular traffic control and must be used with Nice control boards.
Describes swing gates and the need for regular maintenance and inspection for safe operation.
Emphasizes safety, security, proper installation of safety devices, and preventing human interaction with moving parts.
Explains the role of safety devices in preventing damage and injury from gate movement.
Highlights the importance of warning signs and safety features like infrared beams for hazard awareness.
Stresses the necessity of all sensors and safety devices being in place and operational for safe gate operation.
Reinforces the use of infrared beams and visible warning signs to prevent injury and damage.
Instructs installers to position the opener according to manual guidelines to prevent binding or improper articulation.
A general reminder to follow all instructions provided in the manual.
Strict warning to prevent children from operating or playing with gate controls or in the gate area.
Details the importance of periodic testing, especially for reversing mechanisms and safety devices.
Advises on the need for qualified service personnel for repairs and maintenance.
General guidance for safe and optimal operator longevity and performance.
Specifies the actuator is for vehicular swing gates used with a Nice brand control board.
Covers general hazards, system design, pinch points, gate operation safety, and maintenance.
Provides instructions and diagrams for correctly mounting the pivot arm for various gate swing directions.
Details the pivot arm installation for push-to-open gate configurations.
Illustrates the correct method for mounting the actuator to the pivot arm and gate bracket.
Explains the procedure for disengaging and re-engaging the actuator for manual gate operation.
Guides on connecting wires to the actuator terminal block for limit switches and motors.
Provides wiring diagrams for 1050 and 936 control boards for both pull-to-open and push-to-open configurations.
Details the process for setting and adjusting the open and close limits for the gate operator.
Diagrams illustrating the placement of loop sensors and photocells for entrapment protection.
Diagrams showing the typical layout for photocells used as entrapment protection.
Discusses the installation of non-contact and contact sensors for external entrapment protection.