EasyManua.ls Logo

Nobles Speedshine 2000 - Machine Components; Machine Setup; Installing Pad

Default Icon
31 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATION
Speedshine 1200/1600/2000 (12--06)
6
MACHINE COMPONENTS
1
2
3
4
5
7
11
9
6
8
10
1. Power ON/OFF Twist Grips
2. Handle Release Lever
3. Safety Lock Button
4. Circuit Breaker Button
5. Power Cord Hook
6. 75 ft / 23 m Power Cord
7. Motor Cover
8. T ransport Wheels
9. Burnish Head
10. Bumper
11. Burnishing Pad
MACHINE SETUP
Carefully check carton for signs of damage. Report
damages at once to carrier.
INSTALLING PAD
FOR SAFETY: Before leaving or servicing
machine, unplug cord from wall outlet.
1. The machine is shipped fully assembled. Pads are
sold separately. Select and install a recommended
pad that best meets your burnishing needs.
NOTE: Consult your authorized distributor for pad
recommendations. Use only manufacturer supplied or
approved pads.
2. Pull the handle release lever and raise the handle
to the upright position. Carefully tilt the machine
backwards and rest the handle on the floor
(Figure 1).
FIG. 1
3. To install the pad, remove the plastic centerlock
ring from the pad driver by turning it counter-
clockwise. Position the pad on the pad driver and
replace centerlock ring by turning it counter--
clockwise. Make sure the centerlock ring is
fastened securely (Figure 2).
FIG. 2
4. Return machine to the upright position.

Related product manuals