After installing the condensate drain piping
Make sure that there are no obstructions blocking
the condensate drain line from discharging
condensate.
Be sure to check that condensate is freely flowing
from the condensate drain piping.
Condensate will begin flowing out of the Combi
Boiler within 15 minutes after operation has
started.
Freeze prevention
Take measures to prevent the condensate drain
lines from freezing (insulation, heat tape, electric
heaters, etc.).
Drain pipe
Drain connecting
supply
Heat insulation
material
[If an external neutralizer is installed]
Periodic replacement of the neutralizing agent will
be required.
Refer to the instructions supplied with the
neutralizer for suggested replacement intervals.
Floor drain
Connecting the Condensate Drain