17
Table 3
1 - PIPE INSTALLATIONS
VENT UPFLOW HORIZONTAL RIGHT HORIZONTAL LEFT
Right Option 1 Option 6
Left Option 2 Option 5
2 - PIPE INSTALLATIONS
VENT UPFLOW HORIZONTAL RIGHT HORIZONTAL LEFT
Right Option 3 Option 8
Left Option 4 Option 7
assembly.
switch.
inducer assembly.
4. Remove 4 screws securing the inducer assembly to
5. Rotate the inducer assembly to its new position.
NOTE:
reinstalling the 4 screws.
7. Move the cabinet plug from side of furnace and reinstall
in hole on opposite side of cabinet.
8. Reconnect the electrical harness to the inducer
assembly.
Accessories
The components in 18) are
installation, some of these components are optional and
may not be used. Please refer to the descriptions and
air pipe through the top of the furnace. NOTE:
installation, it is important that the pipe and screw holes
.
1. Position flange gasket over hole in the furnace cabinet.
supplied sheet metal screws.
.
between the furnace cabinet and the gas pipe. The rubber
side of the cabinet and the drain tube is routed through
the blower deck. Remove the plastic plug from the hole
and install the grommet before routing the drain tube.
disposal and, in some cases, the need to seal the furnace
cabinet.
IMPORTANT NOTE
Before using Table 3
select the option that properly matches your installation
type from 34)35).
NOTE:
maintain an airtight flow path from the air inlet to the flue
be closed off with the plastic cap to maintain air tightness
horizontal furnaces are indicated in 29).
WARNING:
CAUTION:
It is good practice to label all wires prior to