OPERATION
POSITIONING THE SHEET PILE
1. Using a pipe that is approximately 6 ft. (1.5 m) long or other suitable means, turn the
sheet pile into position.
2. Insert the sheet pile into the last one installed, then drive it vertically with appropriate
force.
NOTE: Before starting to push a sheet pile, make sure it is securely chucked.