EasyManua.ls Logo

NSK VarioSurg 3 - Coolant Hanger Post Installation; Irrigation Tube Insertion

NSK VarioSurg 3
121 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
5-5 Connection of the Coolant Solution Hanger Post
Align the Coolant Solution Hanger Post onto the Control Unit
holder and firmly push it down.
5-6 Insertion of the Irrigation Tube
1) Close the Tube Clamp which is placed between the Irrigation Needle and the Irrigation
Pump. (Fig. 9)
2) Hang the Solution Pack onto the Coolant Solution Hanger Post.
3) Insert the Irrigation Needle into the Pack entry point. (Fig. 10)
4) Insert the other Irrigation Tube tip into the handpiece Irrigation Nozzle. (Fig. 11)
5) Open the cap to let air into the Pack. (Fig. 12)
6) Open the Tube Clamp.
CAUTION
ŘBefore closing the Pump Cover, make
that the tube is correctly positioned on
the rollers. If the tube is not correctly
positioned, and the Cover is closed, the
tube could be crimped or sheared.
ŘBefore fitting the Irrigation Tube, make sure
the Irrigation Pump is stopped.
Fig. 8
Fig. 7
Fig. 9
Fig. 10 Fig. 11 Fig. 12
CAUTION
ŘInsert the Coolant Solution Hanger Post all the way down firmly. If the Post guide and the groove guide are
not aligned, the Post cannot be inserted all the way down.
ŘUse a 500ml pack of solution. Maximum pack size is 800g for the Coolant Solution Hanger Post.
Tube Clamp
Mouth of the
pack
Irrigation Needle
Irrigation Nozzle
Cap
Align
9DULR6XUJ(1LQGG 

Table of Contents

Related product manuals