EasyManua.ls Logo

NT-MDT NTEGRA Spectra - Page 28

Default Icon
59 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NTEGRA Spectra Probe NanoLaboratory. SNOM Measuring Head. Instruction Manual
3. Mount the positioning device with the optical tube on the base unit as follows:
a. Loosen nuts of the guide pins 1 (Fig. 2-7).
a)
b)
Fig. 2-7. Positioning device
1 nuts for fastening the guide pins; 2 guide pins;
3 slots of the M4×8 fastening screws
b. Carefully place the positioning device so that the guide pins match the seats of the
replaceable panel (Fig. 2-8).
Fig. 2-8. Replaceable panel mounted on the base unit
c. Secure the positioning system with three M8 screws (pos. 3 in Fig. 2-7), with
Allen key.
Seats of the positioning device
20