nvent RAYCHEM E-100-LR-A - Step 4 A and 4 B

nvent RAYCHEM E-100-LR-A
8 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
nVent.com | 3
BTV, QTVR
XTV, KTV
BTV, QTVR
XTV, KTV
Go to Step 5a
Go to Step 5b
5/8 in
(16 mm)
Strain
relief
1 1/4 in
(32 mm)
Do not cut
bus wires.
4A
1 1/8 in
(28 mm)
1/2 in
(13 mm)
Strain
relief
1/4 in
(6 mm)
1/4 in
(6 mm)
Do not cut
bus wires.
Skip Step 5 and go to Step 6
1/2 in
(13 mm)
1/2 in
(13 mm)
VPL
4B
Ensure 1 1/4 in (32 mm) of
heating cable is exposed
above end seal strain relief.
Mark heating cable jacket.
Lightly score jacket
around and up as
shown.
Peel off jacket.
Determine heating cable
type and continue as
shown.
Ensure 1 1/8 in (28 mm) of
heating cable is exposed
above end seal strain relief.
The conductor should
remain staggered.
Lightly score jacket
around and up as
shown.
Peel off jacket.
Unwind heating element, cut
and remove as shown.
Lightly score clear jacket
around and up as shown.
Peel off jacket.
Remove insulation from
ends of bus wires.
Note: Core sealer is not
used on VPL.
Discard core sealer.