EasyManua.ls Logo

Olympus BF-UC180F - 7.4 Leakage Testing

Olympus BF-UC180F
183 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 7 Cleaning, Disinfection, and Sterilization Procedures
97
ULTRASONIC BRONCHOFIBERVIDEOSCOPE BF-UC180F
Figure 7.16
5. Disconnect the ultrasonic cable from the endoscope connector.
6. Disconnect the videoscope cable from the endoscope connector.
7. Disconnect the endoscope connector from the light source.
8. Transport the endoscope and the container holding the other items to the
reprocessing area.
7.4 Leakage testing
After precleaning, perform leakage testing on the endoscope to ensure that it is
waterproof.
Equipment needed
Prepare the following equipment, and wear appropriate personal protective
equipment.
Personal protective equipment
Large basin
Clean water (see Section 6.2)
Maintenance unit or light source (MU-1 or CLV-180, CLV-160, CLV-U40)
Leakage tester (MB-155)
Water-resistant cap (2 pcs) (MH-553)

Table of Contents

Other manuals for Olympus BF-UC180F

Related product manuals