28
Chapter 3 Preparation and Inspection
LF-TP/DP/GP OPERATION MANUAL
3.5 Preparation, Inspection and Connection of
Ancillary Equipment
Preparation and Inspection of Ancillary Equipment
Prepare and inspect the Suction Pump as described in its instruction manual.
Connection of the Endoscope and Ancillary Equipment
Connect the suction tube from the Suction Pump to the Suction Connector on
the endoscope.
3.6 Inspection of the Endoscopic System
Inspection of the Illumination
1.
To turn the lamp on, rotate the Miniature Light Source and align the “ON”
mark with the red Mark#3 (see Figure 3.13).
Figure 3.13
“OFF”
mark
Mark#3
(red)
“ON”
mark
Not illuminated Illuminated