7 Troubleshooting
7-19
NJ/NX-series Database Connection CPU Units User’s Manual (W527)
7
DB Connection Setting Error
The DB Connection settings are not correct.
Source PLC Function Module Source details DB Connection
Service
Detection
timing
At download,
power ON, or
Error attributes Level Minor fault Recovery Automatic
Log category System
Effects
User program
Continues. Operation The DB Connection Service cannot be started.
The operation status of the DB Connection Service is
DB Connection Service Status
The power supply to the
Controller was interrupted during
a download of the DB
Connection settings.
Transfer the DB Connection
settings again from Sysmac
Studio.
Do not turn OFF the power supply
to the Controller during a download
of the user program or the
Controller Configurations and
The DB Connection settings are
not correct because the power
supply to the Controller was
interrupted during a Clear All
Do not interrupt the power supply
to the Controller during a Clear All
Memory operation.
The DB Connection settings are
not correct because the power
supply to the Controller was
interrupted during a Restore
Do not interrupt the power supply
to the Controller during a Restore
operation.
Non-volatile memory failed. If the error persists even after you
make the above correction,