EasyManua.ls Logo

OneAccess ONECell 25 - 7 Power up

OneAccess ONECell 25
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ONECELL25 - Installation Manual
21
7 Power up
To power up the device, always follow these steps:
Connect the DC power input jack from the power supply to the DC power
input of the rear panel of the router,
Connect the power supply to the AC mains (200-240 V AC).
Few seconds after power-on, the device performs a series of self-tests and loads
the software into memory (RAM), during which the ’STATUS’ LED on the front panel
blinks.
At the end of software loading (about 30 seconds):
The ’STATUS’ LED light remains steady green if software initialization was
successful,
The ’STATUS’ LED blinks in case of software absence or error during
software loading.

Related product manuals