For Single Dwelling Units a pre-connectorised
cable will be available in different lengths
(5m, 20m, 30m, 50m and 100m) and will come in
individual bags that can be ordered via the FBC.
A minimum length of 2m of excess cable will be
left coiled externally for ease of installation.
Once the pre-connectorised cable is
installed then Openreach (or their third party)
will visit to terminate the pre-connectorised
cable at the external CSP location back to the
serving Splitter location(s) and then commission
the plot.
Single dwelling units
Run the pre-connectorised cable from
agreed ONT position back to external
Customer Splicing Point (CSP).
The bend radius of cable must meet
all necessary installation requirements
i.e. no 90 degree bends.
Coil 1m of pre-connectorised cable
into the empty double back box, taking
care not to damage the connectorised
end and t blanking plate to help
protect bre.
Ensure the green caps on the end of the
connectorised internal bre cable are
kept on during construction to avoid
damage to the bre cable.
Installation of pre-connectorised
cable at rst x (Internal Work)
Step 1
Step 2
Cabling and ONT positioning