EasyManua.ls Logo

Openreach ONT - Page 49

Openreach ONT
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
49
All tubes or cables presented
as per schematic diagram and
capped.
Multi
Dwelling Unit
Designated track ways/trays
supports in good working order with
separations maintained.
Connectorised bre cable installed
as per schematic in accordance with
Manufacturer’s specications and
IET wiring regulations. Cable labelled
and coiled safely within riser.
Connectorised bre cable installed
with 1m of spare length protruding
from the back box to enable jointing.
Back box tted in each unit at a
usable depth, within close proximity
to a double 240v outlet for FTTP
connectivity.
Location of unit entry suitable for
FTTP equipment.
If FTTP self install development ONT,
BBU, all leads connected correctly
and plot commissioned
If self install but Openreach
completed all internal work then
SOD payment for self install is
not applied.
Item being audited Category
Yes No N/A
Checked and
Acceptable
Standard?
Comments
Multi
Dwelling Unit
Multi
Dwelling Unit
Multi
Dwelling Unit
Multi
Dwelling Unit
Multi
Dwelling Unit
Multi
Dwelling Unit
Multi
Dwelling Unit
Quality control checklist
How to build a fibre network - version 7.1

Table of Contents