Operation 115
Sure Sort™ Operator Manual
OPEX Corporation
3. Both the host computer and scan tunnel RTM computer should start with
the UPS. Confirm that the power LEDs of both computers are on (
Figure 4-
4).
Figure 4-4: Host and RTM computer power LEDs
4. Log in to the Sure Sort Host software at the operator station (see “Logging
in to the Host software” on page 120).
Host computer power LED
RTM computer power LED