Version 2.5.1 - 2020-07-28 39Translation of original instructions
MH20V | MH20VL | MH20VLD GB
MH20V_GB_5.fm
Interval Where? What? How?
Start of work,
after every
maintenance or
repair work
Milling machine
"Safety check“ on page 15
Start of work,
after every
maintenance or
repair work
Dovetail guides
Oiling
Oil all guide rails.
Every week
Milling table
Oiling
Oil all bare steel surfaces. Use acid-free oil.
Monthly
Clamping bolts
Milling head
firmly tight-
ened
Ensure that the clamping bolt for swivelling the drill head is
firmly tightened.
Every month
Oiler cup
Oiling
Lubricate all oiler cups with machine oil, do not use grease
guns or the like.