Power Cycling 5-3
Forcing Switchover for HA Nodes 5-3
Chassis Removal 5-5
Removing the Acme Packet 1100 from an Equipment Rack 5-5
Cooling System Maintenance 5-6
Maintaining the Cooling Components 5-6
6
Specifications
Safety and Regulatory Certifications 6-1
Acme Packet 1100 System Specifications 6-1
Chassis Mounting Flanges Physical Specifications (Optional) 6-2
AC Power Supply Specifications 6-2
Power Supply Input Circuit Fuse Requirements 6-2
Environmental Specifications 6-2
Connector Specifications 6-3
A
Alarms
Hardware and Environmental Alarms A-1
Hardware Temperature Alarm A-1
Fan Speed Alarms A-2
Environmental Sensor Alarm A-2
Link and SDP Alarms A-2
Media Ethernet Link Alarms A-2
Management Ethernet Link Alarms A-3
v