MAINTENANCE OPERATIONS TO BE CARRIED OUT BY THE USER
DANGER
Before perform any maintenance operation on the machine, cut off the engine, and remove the
sparkin wire from the sparking plug
If maintenance operation are not realized, damages can occur to the machine and personnal injuries
to the user and/or spectators. These damages and injuries will not be covered by the warranty.
• Daily maintenance will be performed by the user.
• Maintenance opérations for first 20 hours, 100 and 300 should be realized by the dealer.
• Ask to your dealer to check the machine if you meet some problems.
• Ask to your distributor the name of your dealer.
Daily maintenance, before start mowing
Gear box Oil level : check by the gauge (A figure 8. Oil level
should appear in the middle of the window. when the gauge
is put on his place without screwing it. Check only engine
stopped since ten minutes on a flat level surface.
• Use only good quality gear oil SAE90 or API GL-5.
• Oil Quantity : 1.60L
Transmission oil replacement frequency
Engine oil level : see the engine manual. Check the level on the gauge (2 figure 9).
Fuel (Figure 9 1)
Check tank level is full before start to work. Check that tank plug (1, Figure 9 is fully closed, and
check for leaks. Use only a good quality unleaded gasoline.
DANGER
Check fuel tank is closed, wipe fuel spillages before start the machine. Check there is no fire,
electric sparks, cigarettes near the machine when refuelling.