EasyManua.ls Logo

oxycom IntrCooll Std. - Drain Connection Requirements; Overflow Connection Requirements

oxycom IntrCooll Std.
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Prepare the location
Version 1.3, 2021-12-14 31
1
2
3
4
5
3.11.2 Supply water ow requirements
For ow requirements of the supply water for the unit, refer to the specication
sheets.
3.12 Drain connection requirements
The drain connection on the IntrCooll® can be set up in two dierent
congurations:
- The drain valve discharges directly onto the roof top. To bridge the distance
between the connection and the rooftop (i.e. to prevent dripping noise),
connect an extension tube to the drain.
- It is possible to connect the drain valve to a local drain circuit.
3.13
Overow connection requirements
The overow connection on the IntrCooll® can be set up in two dierent
congurations:
- The drain valve discharges directly onto the roof top. To bridge the distance
between the connection and the rooftop (i.e. to prevent dripping noise),
connect an extension tube to the drain.
- It is possible to connect the overow output to a (combined) drain circuit.