EasyManua.ls Logo

oxycom IntrCooll Std. - Operation Procedures; Operating the Unit and Initial Checks

oxycom IntrCooll Std.
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Version 1.3, 2021-12-14 53
1
2
3
4
5
5 Operation procedures
5.1 How to operate the IntrCooll®
5.1.1 Checks before starting
Before starting make sure that:
- All panels and covers of the IntrCooll® are installed.
- There is no marking on the IntrCooll® ‘DO NOT START.
- There are no loose or strange parts within the IntrCooll®.
- The water supply to the IntrCooll® is connected.
- The correct lters are installed.
- The correct ow regulator cap (50 Hz / 60 Hz) is installed.
- The drain is connected to a local drain circuit
- The IntrCooll® is connected to the mains power supply.
- The maintenance switch is in ON position.
- The padlock switch is in ON postion.
- The thermostat is switched on and connected to the IntrCooll®.
- For correct settings, refer to the enclosed documentation in the thermostat
package.
5.1.2
Check unit installation
Check and nish lling in the Installation checklist on page 48.